11 Cubic Meter Factory Sales-Class 2- Ge Series Eo Sterilization for Disposable Sheets

Customization: Available
Theory: Gas Sterilization
Type: Gas Sterilization Equipments

Product Description

📋 Basic Information
Model NO.:BCS
Certification:CE
Material:Stainless Steel
Doors Type:Pneumatic Sliding/Revolving Door
Specification:1cbm to 100cbm
Service:3D Design & Technical Support
⚙️ Product Description
EO Sterilization Equipment
Volume Pallet Inner Size Sliding Door Size Inner Wall Door Wall Weight
1m³/1400*700*10001750*1270*15206mm6mm1t
2m³/1650*1000*12002070*2520*17206mm6mm2t
5m³2*(1200*1000)2250*1350*17002670*3220*22208mm6mm4.5t
10m³4*(1200*1000)4500*1350*17004920*3220*22206mm8mm7t
20m³7*(1200*1000)7500*1350*20007920*3220*25208mm8mm12t
52m³13*(1200*1000)13900*1400*270014320*3320*32208mm10mm28t
101m³32*(1200*1000)17050*2700*220017510*3300*27808mm10mm45t
📷 Detailed Gallery
Detail View 1
Detail View 2
Technical Specifications
🏭 Production & Quality
Production Line 1
Production Line 2
QC Control
Packaging
Frequently Asked Questions
What is Ethylene Oxide (EtO) Sterilization?
Ethylene oxide is a gas widely used to sterilize more than 50% of medical devices. It is highly effective due to its penetration properties, allowing sterilization of products in their final sealed packaging.
What are the advantages of using EtO sterilization?
It operates at low temperatures to maintain product characteristics, offers the best material compatibility, and has broad microbicidal activity. It is cost-effective for large volumes and can sterilize products with electronics or batteries.
Which medical instruments are suitable for this equipment?
It is ideal for endoscopes, plastic/rubber products (syringes, catheters), surgical instruments, anesthetic vessels, and cotton fiber products like surgical gowns and bandages.
What is the standard warranty period?
The mainframe of the cabinet is guaranteed for at least 5 years, the control system for 2 years, and other purchased components for 1 year.
Do you provide installation and validation support?
Yes, we provide overseas installation and training. We also provide FAT, IQ, OQ documentation, and support for PQ, along with software validation.
What is the production and installation lead time?
Equipment production takes 60-90 days. Installation and debugging typically require 15-60 days depending on chamber size, with IQ/OQ validation taking about 7 days.

Related Products